Skip to main content

Sivortex

Actuel Solar Park

The first energy park that combines photovoltaic generation and CO₂ storage, capable of supplying green energy for 20 hours a day.

+181.818


Solar modules installed

+3.906


Autonomous tracking axes

+28%


Higher production thanks to solar tracking

Discover the project

If you are unable to view the video, access this link.

SOLAR INSTALLATION

More than 180,000 modules that adapt to every light condition

Two parks totalling 100 MWp with more than 181,818 high-performance solar modules on 3,906 autonomous axes. Each axis adjusts its inclination in real time to maximise solar capture, even on cloudy days with indirect radiation. The result: 28% more production compared to conventional installations.
Instalación solar Actuel Solar

CO₂ BATTERY

200,000 kWh of capacity. No critical raw materials. No waste.

Advantages:
Actuel Solar
A thermodynamic storage system that uses CO₂ as its base element. During the day, surplus energy compresses the gas until it becomes liquid, storing the heat generated. At night, the process reverses: the liquid CO₂ evaporates, drives turbines and generates electricity. The cycle is infinite and without degradation.

SMART GRID SOFTWARE

Intelligent energy control, minute by minute

A management system that coordinates in real time the energy produced and stored to guarantee a constant supply. Sensors installed at the connection points of connected companies monitor consumption live. A prediction algorithm based on historical data, big data and artificial intelligence anticipates demand and optimises distribution automatically.
Software Actuel

Frequently asked questions about Actuel Solar

Can I have my own self-consumption installation in my premises?
Yes, in fact it is absolutely recommended. All the energy you can self-produce is energy you will not have to buy, however cheap it may be. In this case you also save the cost of the power term. It will represent a direct saving and less dependence on third parties. We can also manage surpluses to maximise your benefits. If this is your case, we will draw up a personalised energy plan.
We have planned a second phase that will be activated when the plant’s capacity is exceeded.
At this stage of the project, the commercialisation model has not been fully developed. Energy packages may be contracted or all management may be handed over to a retailer.
There is a production of 10 hours of solar energy, the battery can supplement a further 10 hours. The remaining 4 hours will be supplied by the retailer.
One of the possibilities will be that you can invest in the park project, independently of the energy purchase. Please indicate this in the form. In any case, the disbursement would not take place until the construction phase begins.
It depends on the processing, financing and construction permits. The Aragonese government has classified it as a project of interest and the local administration is aligned with the requirements. Construction could begin within a year and will last approximately 18 months.
There is no supply problem, the park is designed and self-managed taking these situations into account as normal occurrences.
The maintenance service will be prepared to minimise interruptions to a minimum, as we are aware of the importance of energy for the smooth running of businesses.

How can we help you?

    Tell us who you are and what you can bring to the team. No need to attach anything, just write to us in your own words.

      Contact

      info@sivortex.com

      973 525 210

      Av. Blondel, 5 25002 LLeida